
Day-to-Day Track Maintenance Part II: Switches & Crossings (1952-01-02)
Overview
Continuing the study of the normal tasks performed by a permanent-way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however complicated are built up.
Watch Trailer
Status: Released
Release Date: 1952-01-02
Runtime: 0h 21m
Director: C. David Lochner